Success Stories: Rooftop Mount

ColdPoint Logistics

Industry: Commercial & Industrial

Mounting Option: Rooftop Mount

ColdPoint Real Estate Logistics, LLC awarded MC Power Companies a 3 MW rooftop solar array project. This design-build project included engineering, construction, and monitoring of the solar array on an existing cold storage facility located in Edgerton, KS. The array provides 3MW of DC power to the building.

Services Provided:

  • Solar PV Design-Build
  • Engineering
  • Construction
  • Commissioning
  • Operations and Maintenance
View Success Story

Target & Kohl’s

Aerial view of a rooftop solar array on Target

Industry: Commercial & Industrial

Mounting Option: Rooftop Mount

MC Power Companies had the great opportunity to work with Target and Kohl’s on multiple projects. On the 12 projects MC Power Companies was subcontracted to oversee the complete install of the systems and the procurement of balance of system materials.

Services Provided:

  • Design
  • Engineering
  • Installation
  • Procurement
View Success Story

IKEA

IKEA rooftop solar array

Industry: Commercial & Industrial

Mounting Option: Rooftop Mount

IKEA, the world’s leading home furnishings retailer in collaboration with MC Power Companies and SoCore Energy designed, constructed and commissioned the State of Kansas’ largest rooftop solar array atop their Merriam, Kansas store. The 92,000-square-foot solar array was completed from design to operation in 10 weeks. The project was completed on time and under budget.

Services Provided:

  • Design
  • Construction
  • Commissioning
View Success Story

Johnson County Community College

Rooftop solar panels at Johnson County Community College

Industry: Education

Mounting Option: Rooftop Mount

The Johnson County Community College selected MC Power Companies over the last few years to design, engineer, procure, and construct 7 solar array projects over three phases for a total of 926.92 kilowatts of DC solar power. These projects consisted of the following buildings, sizes and year completed: HCA Building: 115.92kW, 2016 Student Center: 84.42kW, 2017 WCMT Building 1: 174.60kW, 2022 WCMT Building 2: 80.51kW, 2022 WLB Building: 65.475kW, 2022 Coms Building: 171kW, 2024 Science Building: 235kW, 2024

Services Provided:

  • Engineering
  • Procurement
  • Construction
View Success Story