Centralia City School District #135
Centralia School District awarded MC Power Companies a 485.6kW ground mount solar array. This design-build project included engineering, integration, construction, and monitoring of the new solar array. The new array provides approximately 876,000kWh per year to the offset energy usage at the junior high school.
- Centralia City School District #135
MC Power’s in-house engineering team provided the client with a complete stamped construction set detailing the complete design. The MC Power installation team worked with the client to install this system during normal operating hours without any business interruption. The array consists of 1214– 400-watt Canadian Solar modules. These modules are held in place by a pile driven ground mount racking system. The energy harvested by the solar panels is converted by 10 SMA Core inverters. Monitoring is provided in real time through SMA EnnexOS providing immediate production, fault detection, and email/text alerts, all viewable from a web-based portal. The project, designed, engineered, and constructed by MC Power Companies, was completed on time and within budget.
Location: Centralia, IL
Industry: Education
Mounting Option: Ground Mount
Services Provided
- Solar PV Design - Build
Providing all-in-one energy solutions across the United States.
Let's Get Started