Johnson County Community College
The Johnson County Community College selected MC Power Companies over the last few years to design, engineer, procure, and construct 7 solar array projects over three phases for a total of 926.92 kilowatts of DC solar power. These projects consisted of the following buildings, sizes and year completed: HCA Building: 115.92kW, 2016 Student Center: 84.42kW, 2017 WCMT Building 1: 174.60kW, 2022 WCMT Building 2: 80.51kW, 2022 WLB Building: 65.475kW, 2022 Coms Building: 171kW, 2024 Science Building: 235kW, 2024
The MC Power engineering team confirmed the Student Centers’ roofing, structural, and electrical infrastructures would physically and electrically support the new array. The engineering team provided client with a complete structural review, racking calculations and design, and a full set of electrical plans depicting installation. The MC Power construction team procured the system components and installed them during normal operating hours of the college without any classroom or business interruption.
Location: Overland Park, KS
Industry: Education
Mounting Option: Rooftop Mount
Services Provided
- Engineering
- Procurement
- Construction
Providing all-in-one energy solutions across the United States.
Let's Get Started